{
  "id": 7023160,
  "title": "Mumbai Coastal Road North Project Gains Momentum As Dahisar-Bhayandar Link Road Moves Towards 2028 Completion",
  "url": "https://urgent.news/2026/09/12/mumbai-coastal-road-north-project-gains-momentum-as-dahisar-bhayandar",
  "topic": "world",
  "section": "World",
  "published": "2026-09-12T23:37:44.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/mumbai/mumbai-coastal-road-north-project-gains-momentum-as-dahisar-bhayandar-link-road-moves-towards-2028-completion"
  },
  "original_language": "en",
  "account": null,
  "summary": "The Mumbai Coastal Road North project, which aims to connect Dahisar and Bhayandar through a coastal road corridor, is making significant progress. The final phase of the project, which involves the construction of the bridge foundation and launching-girder work, has already begun. A state-of-the-art casting yard has been set up in Bhayander to manufacture precast concrete structural components required for the project, and 60 piles, five pile caps, four piers, pier caps, and nine bridge segments have already been completed. The project is expected to reduce travel time between Versova and Bhayandar from 90-120 minutes to just 15-20 minutes, and its total cost is estimated at Rs. 20,000 crore.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}