{
  "id": 677760,
  "title": "Drainage construction to close Kaneshie road as GARID works begin in August",
  "url": "https://urgent.news/2026/08/12/drainage-construction-to-close-kaneshie-road-as-garid-works-begin-in",
  "topic": "world",
  "section": "World",
  "published": "2026-08-12T15:10:16.000Z",
  "source": {
    "name": "Adom Online",
    "slug": "adom-online",
    "url": "https://www.adomonline.com/drainage-construction-to-close-kaneshie-road-as-garid-works-begin-in-august/"
  },
  "original_language": "en",
  "account": null,
  "summary": "Ghana Hydrological Authority has announced major drainage construction works along the Accra Academy–Mpamprom–First Light corridor as part of the Greater Accra Resilient and Integrated Development (GARID) project. Head of Drainage at the authority, Richard Amekor, said the project is expected to involve the construction of a major drainage channel measuring about 10 metres wide. He […]",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}