{
  "id": 6382989,
  "title": "Rapid KL to begin Kelana Jaya Line track replacement works on Sept 13",
  "url": "https://urgent.news/2026/09/09/rapid-kl-to-begin-kelana-jaya-line-track-replacement-works-on-sept-13",
  "topic": "world",
  "section": "World",
  "published": "2026-09-09T04:51:41.000Z",
  "source": {
    "name": "Malay Mail",
    "slug": "malay-mail",
    "url": "https://www.malaymail.com/news/malaysia/2026/09/09/rapid-kl-to-begin-kelana-jaya-line-track-replacement-works-on-sept-13/234519"
  },
  "original_language": "en",
  "account": "Kuala Lumpur, on September 9, saw Rapid KL commence a series of phased track replacement works on the Kelana Jaya Line. Commencing on Sunday, the maintenance activities will affect designated stations, altering their service times. Starting at 9.30am on these Sundays, rather than their regular 6am schedule, the modified service times aim to accommodate the track replacement process.\n\nSpanning seven phases, the project is slated for completion by September 2027. Each phase targets specific weekends, commencing with Phase 1 on September 13, 20, and 27, 2026, impacting Taman Melati and Gombak stations. Subsequent phases, adhering to similar patterns, will take effect on various dates through July 2027.\n\nAs stations undergo these essential repairs, passengers can anticipate certain disruptions. Ticket machines will be temporarily out of service until 9.30am, but alternative ticket purchasing methods remain available. Moreover, service disruptions will be mitigated by free shuttle buses connecting affected stations, ensuring continuous travel options. Additional support from station staff, auxiliary police, and Prasarana Troopers will be on hand to assist passengers.\n\nRapid KL emphasizes the importance of these track replacement works in maintaining the Kelana Jaya Line's safety and reliability. Passengers are urged to stay informed about the project's progress, station-specific updates, and alternative services through myRapid or Rapid KL's official social media channels. As the project unfolds, the operator remains committed to supporting a dependable rail network for the future.",
  "summary": "KUALA LUMPUR, Sept 9 — Rapid KL will begin phased track replacement works on the Kelana Jaya Line from...",
  "key_points": [
    "Rapid KL begins Kelana Jaya Line track replacement on September 13.",
    "Phase 1 affects Taman Melati and Gombak stations from September 13.",
    "Shuttle buses and station staff assist passengers during disruptions."
  ],
  "editors_take": "The track replacement works on the Kelana Jaya Line mark a crucial step in maintaining the line's safety and reliability, with phased disruptions set to affect service times and station operations.",
  "illustration": null,
  "coverage": {
    "outlets": 3,
    "also_reported_by": [
      {
        "outlet": "Free Malaysia Today",
        "title": "Kelana Jaya LRT track works to begin Sunday",
        "url": "https://urgent.news/2026/09/09/kelana-jaya-lrt-track-works-to-begin-sunday",
        "published": "2026-09-09T04:20:00.000Z"
      },
      {
        "outlet": "Malay Mail",
        "title": "Rapid KL to begin Kelana Jaya Line track replacement works on Sept 13",
        "url": "https://urgent.news/2026/09/09/rapid-kl-to-begin-kelana-jaya-line-track-replacement-works-on-sept-13",
        "published": "2026-09-09T04:51:41.000Z"
      }
    ]
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}