{
  "id": 5680976,
  "title": "Bhopal’s Bhoj Wetland Demarcation: Drone Survey May Begin Today, Panel Gets 15-Day Deadline",
  "url": "https://urgent.news/2026/09/05/bhopals-bhoj-wetland-demarcation-drone-survey-may-begin-today-panel",
  "topic": "world",
  "section": "World",
  "published": "2026-09-05T00:30:00.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/bhopal/bhopals-bhoj-wetland-demarcation-drone-survey-may-begin-today-panel-gets-15-day-deadline"
  },
  "original_language": "en",
  "account": null,
  "summary": "The National Green Tribunal (NGT) has directed the formation of a seven-member committee for the 7th demarcation of Bhopal's major water bodies and wetlands, including the Bhoj Wetland, Kerwa, and Kaliasot. The committee, which includes environmentalist Dr Subhash C. Pandey and municipal corporation superintending engineer Santosh Gupta, has been given a 15-day deadline to complete the survey. A drone survey of the Bhoj Wetland may commence on Saturday, pending favorable weather conditions and the water level reaching the prescribed Full Tank Level (FTL). The Madhya Pradesh Pollution Control Board (MPPCB) is coordinating the survey in compliance with the NGT's directives.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}