{
  "id": 5498026,
  "title": "Pipe after dark",
  "url": "https://urgent.news/2026/09/04/pipe-after-dark",
  "topic": "world",
  "section": "World",
  "published": "2026-09-04T05:07:54.000Z",
  "source": {
    "name": "Jamaica Gleaner",
    "slug": "jamaica-gleaner",
    "url": "http://jamaica-gleaner.com/article/news/20260904/pipe-after-dark"
  },
  "original_language": "en",
  "account": null,
  "summary": "The pipeline upgrading works from Munroe Road to Wellington Drive are shifting to night-time operations, with the corridor closing almost entirely on Sundays to allow for up to 24-hour construction. The move is part of measures to minimise traffic congestion, particularly with the reopening of schools on Monday. “We want to assure residents that after this weekend we are moving to night work…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}