{
  "id": 524929,
  "title": "AB Road Elevated Corridor Work Begins Between LIG Square And Navlakha In Indore",
  "url": "https://urgent.news/2026/08/11/ab-road-elevated-corridor-work-begins-between-lig-square-and-navlakha",
  "topic": "world",
  "section": "World",
  "published": "2026-08-11T01:30:00.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/indore/ab-road-elevated-corridor-work-begins-between-lig-square-and-navlakha-in-indore"
  },
  "original_language": "en",
  "account": null,
  "summary": "Indore (Madhya Pradesh): After months of traffic congestion caused by stone dumping and construction-related disruptions on the AB Road, the Public Works Department (PWD) has initiated the process for construction of an elevated corridor between LIG Square and Navlakha. The department has reportedly started preparing the pile casting work, while the final design is being processed at the…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}