{
  "id": 5165753,
  "title": "Wenchi–Bole road contracts reduced by 25km over slow progress",
  "url": "https://urgent.news/2026/09/02/wenchi-bole-road-contracts-reduced-by-25km-over-slow-progress",
  "topic": "world",
  "section": "World",
  "published": "2026-09-02T20:12:24.000Z",
  "source": {
    "name": "Adom Online",
    "slug": "adom-online",
    "url": "https://www.adomonline.com/wenchi-bole-road-contracts-reduced-by-25km-over-slow-progress/"
  },
  "original_language": "en",
  "account": null,
  "summary": "Roads and Highways Minister Governs Kwame Agbodza has cut the workload of two contractors on the Wenchi–Bole road project by 25 kilometres each, citing their slow pace of work. China International Water and Electric Corporation and Poly Changda Engineering Company were each contracted to build separate 50-kilometre sections of the Western Corridor road. But after […]",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 3,
    "also_reported_by": [
      {
        "outlet": "Adom Online",
        "title": "Roads minister threatens to terminate Techiman–Nkonsia–Wenchi road contract",
        "url": "https://urgent.news/2026/09/02/roads-minister-threatens-to-terminate-techiman-nkonsia-wenchi-road",
        "published": "2026-09-02T17:25:24.000Z"
      },
      {
        "outlet": "MyJoyOnline Ghana",
        "title": "Roads Minister threatens to terminate Techiman–Nkonsia–Wenchi road contract",
        "url": "https://urgent.news/2026/09/02/roads-minister-threatens-to-terminate-techiman-nkonsia-wenchi-road-5142000",
        "published": "2026-09-02T18:21:42.000Z"
      }
    ]
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}