{
  "id": 458837,
  "title": "'Construction Material Fell Onto An OHE Wire': Central Railway CPRO Swapnil Neela Reveals Reason Behind Train Services Delay On Main Line",
  "url": "https://urgent.news/2026/08/10/construction-material-fell-onto-an-ohe-wire-central-railway-cpro",
  "topic": "world",
  "section": "World",
  "published": "2026-08-10T10:08:25.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/mumbai/construction-material-fell-onto-an-ohe-wire-central-railway-cpro-swapnil-neela-reveals-reason-behind-train-services-delay-on-main-line"
  },
  "original_language": "en",
  "account": null,
  "summary": "Mumbai: Following multiple technical failures reported on Mumbai’s train network during Monday morning’s peak hours, which affected several commuters, Central Railway CPRO Swapnil Neela said that construction material from deck work being carried out near Mulund station had fallen onto the overhead equipment (OHE) wire, leading to a technical fault. Speaking to reporters, Neela said, “At around…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}