{
  "id": 383881,
  "title": "Neelum-Jhelum project unlikely to resume power generation before 2028",
  "url": "https://urgent.news/2026/08/09/neelum-jhelum-project-unlikely-to-resume-power-generation-before-2028",
  "topic": "business",
  "section": "Business",
  "published": "2026-08-09T13:46:58.000Z",
  "source": {
    "name": "Daily Times",
    "slug": "daily-times",
    "url": "https://dailytimes.com.pk/1535946/neelum-jhelum-project-unlikely-to-resume-power-generation-before-2028/"
  },
  "original_language": "en",
  "account": null,
  "summary": "The 979-megawatt Neelum-Jhelum Hydropower Project is unlikely to resume electricity generation before 2028, as rehabilitation work is expected to continue for another two years. The project has remained closed since 2024 after a major fault disrupted operations. The prolonged shutdown has raised fresh concerns about the project’s reliability, costs and long-term performance. The facility was […]",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}