{
  "id": 3696593,
  "title": "Kaneshie flooding: Major drainage works begin",
  "url": "https://urgent.news/2026/08/27/kaneshie-flooding-major-drainage-works-begin",
  "topic": "world",
  "section": "World",
  "published": "2026-08-27T07:28:04.000Z",
  "source": {
    "name": "Ghanaian Times",
    "slug": "ghanaian-times",
    "url": "https://ghanaiantimes.com.gh/kaneshie-flooding-major-drainage-works-begin/"
  },
  "original_language": "en",
  "account": null,
  "summary": "Work is set to begin on the construction of a double-cell underground rectangular stormwater drain from Pamprom to First Light in Kaneshie, along the Dr Busia Highway. The project, being undertaken under the Greater Accra Resilient and Integrated Development (GARID) Project, is expected to be completed in October 2027. Click to continue reading You can … The post Kaneshie flooding: Major drainage…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}