{
  "id": 3205880,
  "title": "220kV Nha Be-Tao Dan underground power line put into operation",
  "url": "https://urgent.news/2026/08/25/220kv-nha-be-tao-dan-underground-power-line-put-into-operation",
  "topic": "business",
  "section": "Business",
  "published": "2026-08-25T06:28:07.000Z",
  "source": {
    "name": "SGGP English Edition Business",
    "slug": "sggp-english-edition-business",
    "url": "https://en.sggp.org.vn/220kv-nha-be-tao-dan-underground-power-line-put-into-operation-post129175.html"
  },
  "original_language": "en",
  "account": "The 220kV Nha Be-Tao Dan underground power line project in Ho Chi Minh City was completed in eight months, four months ahead of schedule. It covers the section from Nha Be Substation to Rach Dia Bridge, stretching over 3.2km with an investment of more than VND1 trillion (US$39 million). The project, developed by Phu Long Group, utilized robotic underground drilling technology to ensure technical requirements and route accuracy, including drilling a 214-meter section beneath the Rach Dia River. The underground cable system comprises two circuits, replacing existing overhead power lines. Deputy Director Nguyen Thi Kim Ngoc highlighted that the project would enhance the city's power system safety and reliability, freeing up urban space for synchronized development of transport and technical infrastructure. General Director Nguyen Vu Anh Tu of Phu Long Group emphasized that the project was completed ahead of schedule while meeting strict technical standards, showcasing the company's commitment to creating a green, clean, modern, and sustainable living environment.",
  "summary": "The 220kV Nha Be-Tao Dan underground power line project in Ho Chi Minh City has been completed in eight months, four months ahead of schedule.",
  "key_points": [
    "220kV underground power line completed in 8 months ahead of schedule",
    "3.2km power line stretches from Nha Be Substation to Rach Dia Bridge",
    "Project enhances city power system safety and frees urban space"
  ],
  "editors_take": "The completion of the 220kV Nha Be-Tao Dan underground power line enhances Ho Chi Minh City's power system safety and reliability, while freeing up urban space for other development.",
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}