{
  "id": 2393171,
  "title": "GRIDCo to construct substation at Adaklu to improve power supply in Ho Municipality",
  "url": "https://urgent.news/2026/08/21/gridco-to-construct-substation-at-adaklu-to-improve-power-supply-in",
  "topic": "world",
  "section": "World",
  "published": "2026-08-21T14:19:25.000Z",
  "source": {
    "name": "MyJoyOnline Ghana",
    "slug": "myjoyonline-ghana",
    "url": "https://www.myjoyonline.com/gridco-to-construct-substation-at-adaklu-to-improve-power-supply-in-ho-municipality/"
  },
  "original_language": "en",
  "account": "The Ghana Grid Company Limited (GRIDCo) is planning to build a new power substation in Adaklu, a location in the Volta Region, with the aim of enhancing the reliability of electricity supply in the Ho Municipality. During a meeting of the Volta Regional Coordinating Council, the Volta Regional Minister, James Gunu, revealed this decision. The substation will effectively disconnect Ho Municipality from the Asiekpe grid, ensuring the regional capital has a separate power source. This initiative is expected to provide the area with a more consistent and uninterrupted electricity supply, addressing the challenges posed by rapid urbanisation and increased industrial activity. These factors have previously put considerable strain on the existing power infrastructure, leading to instances of power rationing and negatively impacting commercial and industrial operations. Gunu highlighted that the Ministry of Energy and Green Transition's goal is to permanently resolve the region's power issues and establish a resilient environment for economic growth. In a related announcement, plans are underway to extend electricity coverage to approximately 306 communities in the region through a special electrification initiative. Regarding compensation for the victims of the Akosombo dam spillage, Gunu confirmed that President John Dramani Mahama instructed the Minister of Finance to release the funds. He assured the affected communities that the disbursement process is progressing and is expected to commence before the end of the year. Gunu also disclosed that the Volta region is experiencing significant road construction projects, which, when completed, will alleviate transportation difficulties and boost economic activities. Additionally, he revealed that plans are well advanced for the establishment of a new campus of the University of Health and Allied Sciences, specifically for the School of Pharmacy and Biomedical Sciences, with the necessary land already secured. The Keta Sea Defence Project, meanwhile, is progressing steadily and has reached 40 percent completion. Gunu expressed optimism that by 2028, the National Democratic Congress Government would fulfill its development promises to the citizens of Ghana. For the successful implementation of government programs and initiatives aimed at improving citizens' livelihoods, Gunu urged Metropolitan, Municipal, and District Assemblies to work together effectively. He also emphasized the importance of adhering to approved technical specifications and quality standards for all ongoing development projects. Describing the Volta region as a peaceful, stable, and attractive environment for investment, Gunu encouraged both local and foreign investors to take advantage of the region's economic opportunities.",
  "summary": "The Ghana Grid Company Limited (GRIDCo) is set to construct a new power substation at Adaklu in the Volta Region to improve electricity supply reliability in the Ho Municipality.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}