{
  "id": 22590025,
  "title": "East-West Link line successfully reconnected, Sabah electricity supply restored in stages",
  "url": "https://urgent.news/2026/11/29/talian-east-west-link-berjaya-disambung-bekalan-elektrik-sabah",
  "topic": "world",
  "section": "World",
  "published": "2026-11-29T13:15:47.000Z",
  "source": {
    "name": "Free Malaysia Today",
    "slug": "free-malaysia-today-freemalays",
    "url": "https://www.freemalaysiatoday.com/category/bahasa/tempatan/2026/11/29/talian-east-west-link-berjaya-disambung-bekalan-elektrik-sabah-dipulih-berperingkat"
  },
  "original_language": "ms",
  "account": "The East-West Link line connecting Kolopis in the West Coast to Segaliud in the East Coast has been successfully reconnected, according to Sabah Electricity CEO Yaakob Jaafar. Following the completion of the Emergency Restoration System tower, testing was conducted between the Kolopis and Segaliud terminals to begin the power switching process for the 275 kilovolt transmission line. This restoration follows an incident last Thursday when a transmission tower collapsed due to riverbank erosion caused by heavy rain, affecting 153,599 registered users. Approximately 150 workers in Ranau completed 86 hours of work to restore the line, with Sabah Electricity aiming to fully restore power by 2 December or earlier.",
  "summary": "After the ERS tower was completed this afternoon, Sabah Electricity found that the East-West Link line can now begin the electricity connection process.",
  "summary_source": "publisher",
  "key_points": [],
  "editors_take": null,
  "opinion": false,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "machine_translated": true,
  "ai_generated": true,
  "disclaimer": "Accounts, briefs, key points, the editor’s take and translations are written by software from other outlets’ reporting and may contain errors. A summary whose summary_source is \"publisher\" is the outlet’s own feed text. Always check the linked original."
}