{
  "id": 22576740,
  "title": "General : Southern MADANI Link Phase 1A More Than 30 Pct Complete",
  "url": "https://urgent.news/2026/11/29/general-southern-madani-link-phase-1a-more-than-30-pct-complete",
  "topic": "world",
  "section": "World",
  "published": "2026-11-29T10:36:50.000Z",
  "source": {
    "name": "Bernama",
    "slug": "bernama",
    "url": "http://www.bernama.com/en/news.php?id=2641293"
  },
  "original_language": null,
  "account": null,
  "summary": "Construction of Phase 1A of the Sabah Southern MADANI Link (SSML), a 60-kilometre electricity transmission line connecting Sipitang and Tenom, is more than 30 per cent complete as of this month.",
  "summary_source": "publisher",
  "key_points": [],
  "editors_take": null,
  "opinion": false,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "machine_translated": false,
  "ai_generated": false,
  "disclaimer": "Accounts, briefs, key points, the editor’s take and translations are written by software from other outlets’ reporting and may contain errors. A summary whose summary_source is \"publisher\" is the outlet’s own feed text. Always check the linked original."
}