{
  "id": 22331052,
  "title": "Expected Cost of High-Speed Lahore-Rawalpindi Rail Project",
  "url": "https://urgent.news/2026/11/28/expected-cost-of-high-speed-lahore-rawalpindi-rail-project",
  "topic": "world",
  "section": "World",
  "published": "2026-11-28T07:31:32.000Z",
  "source": {
    "name": "ProPakistani",
    "slug": "propakistani",
    "url": "https://propakistani.pk/2026/11/28/expected-cost-of-high-speed-lahore-rawalpindi-rail-project/"
  },
  "original_language": null,
  "account": "The proposed Lahore-Rawalpindi high-speed rail project is anticipated to cost around Rs. 625 billion, following the completion of its preliminary feasibility study and planning. The railway track between Lahore and Rawalpindi, spanning approximately 290 kilometers, will be upgraded to accommodate trains traveling at speeds up to 160 km/h. Additionally, a new railway line will be built parallel to the existing track, connecting Lahore, Gujranwala, Gujrat, Jhelum, Chakwal, and Rawalpindi.\n\nThe project also includes the redevelopment of 38 railway stations, with the expansion of platforms and their transformation into modern multimodal transport hubs. These hubs will feature automated ticketing systems, park-and-ride facilities, and advanced European Train Control System (ETCS). Additionally, structural overpasses will be constructed along a 50-kilometer stretch between Dina and Sohawa.\n\nThe railway corridor will be equipped with a centralized traffic control system, fiber-optic communication infrastructure, and state-of-the-art safety, security, and monitoring systems. The project's economic and financial feasibility assessment considers projected passenger numbers, expected revenue, and the costs associated with train operations and maintenance.",
  "summary": "The proposed Lahore-Rawalpindi high-speed rail project is estimated to cost nearly Rs. 625 billion, with its preliminary feasibility study and …",
  "summary_source": "publisher",
  "key_points": [],
  "editors_take": null,
  "opinion": false,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "machine_translated": false,
  "ai_generated": true,
  "disclaimer": "Accounts, briefs, key points, the editor’s take and translations are written by software from other outlets’ reporting and may contain errors. A summary whose summary_source is \"publisher\" is the outlet’s own feed text. Always check the linked original."
}