{
  "id": 22146887,
  "title": "China's chip expansion stalls on two-year tool waits, and missing parts are to blame",
  "url": "https://urgent.news/2026/11/27/chinas-chip-expansion-stalls-on-two-year-tool-waits-and-missing-parts",
  "topic": "tech",
  "section": "Tech",
  "published": "2026-11-27T09:20:19.000Z",
  "source": {
    "name": "DigiTimes Asia",
    "slug": "digitimes-asia",
    "url": "https://www.digitimes.com/news/a20261127PD213/china-semiconductors-capacity-expansion-component-equipment-smic.html"
  },
  "original_language": "en",
  "account": null,
  "summary": "China's foundries keep adding capacity, but longer equipment lead times are starting to slow them down. SMIC says the global semiconductor equipment supply chain remains tight. Lead times for some tools have stretched to 16-24 months, and a few now exceed 24 months. Some equipment that was due this year has been pushed back to next year.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}