{
  "id": 21993923,
  "title": "KMA orders traders to vacate Kejetia project lanes as construction resumes",
  "url": "https://urgent.news/2026/11/26/kma-orders-traders-to-vacate-kejetia-project-lanes-as-construction-21993923",
  "topic": "world",
  "section": "World",
  "published": "2026-11-26T14:31:52.000Z",
  "source": {
    "name": "MyJoyOnline Ghana",
    "slug": "myjoyonline-ghana",
    "url": "https://www.myjoyonline.com/kma-orders-traders-to-vacate-kejetia-project-lanes-as-construction-resumes/"
  },
  "original_language": "en",
  "account": "The Kumasi Metropolitan Assembly (KMA) has instructed traders and occupants to vacate designated lanes and surrounding areas of the Kejetia Redevelopment Project Phase II immediately as construction resumes. This move aims to provide contractors with unobstructed access to the site for the safe movement of equipment, materials, and personnel. The Assembly emphasized the need to keep lanes clear to prevent construction delays, minimize accident risks, and safeguard the safety of all parties involved. KMA urged affected persons to cooperate with contractors and authorities, stressing the importance of access to the designated areas for the project's smooth and timely execution. The Assembly also warned traders against returning to the cleared spaces while construction works are ongoing, threatening measures to ensure compliance. The public was advised to prioritize safety and allow contractors to carry out the work without hindrance.",
  "summary": "The Kumasi Metropolitan Assembly (KMA) has directed traders and other occupants operating along dedicated lanes and adjoining areas of the Kejetia Redevelopment Project Phase II to vacate the spaces immediately as construction works resume.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 3,
    "also_reported_by": [
      {
        "outlet": "Ghanaian Times",
        "title": "KMA directs traders to vacate Kejetia dedicated lanes as phase II works resume",
        "url": "https://urgent.news/2026/11/26/kma-directs-traders-to-vacate-kejetia-dedicated-lanes-as-phase-ii",
        "published": "2026-11-26T13:12:16.000Z"
      },
      {
        "outlet": "Adom Online",
        "title": "KMA orders traders to vacate Kejetia project lanes as construction resumes",
        "url": "https://urgent.news/2026/11/26/kma-orders-traders-to-vacate-kejetia-project-lanes-as-construction",
        "published": "2026-11-26T13:50:47.000Z"
      }
    ]
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}