{
  "id": 21858637,
  "title": "Western Railway To Build ₹98-Crore Coaching Depot At Currey Road To Boost Long-Distance Train Capacity",
  "url": "https://urgent.news/2026/11/25/western-railway-to-build-98-crore-coaching-depot-at-currey-road-to",
  "topic": "world",
  "section": "World",
  "published": "2026-11-25T20:00:00.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/mumbai/western-railway-to-build-98-crore-coaching-depot-at-currey-road-to-boost-long-distance-train-capacity"
  },
  "original_language": null,
  "account": "Mumbai: The Western Railway is constructing a new ₹98-crore coaching depot at Currey Road to augment long-distance train capacity, amid limited space at Mumbai Central. Spanning 55,000 square meters, the facility will feature 10 railway lines for maintenance, inspection, repair, and stabling of trains. The project is expected to be completed by December 2028 and will help alleviate pressure on Mumbai Central's existing coaching facilities.",
  "summary": "Mumbai: With limited space for maintaining and parking long-distance trains at Mumbai Central, Western Railway is planning a new, Vande Bharat-compatible coaching depot at Currey Road. Spread across approximately 55,000 square metres, the proposed facility will have 10 railway lines dedicated to maintenance, inspection, repair and stabling of trains. The ₹98-crore project is targeted for…",
  "summary_source": "publisher",
  "key_points": [],
  "editors_take": null,
  "opinion": false,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "machine_translated": false,
  "ai_generated": true,
  "disclaimer": "Accounts, briefs, key points, the editor’s take and translations are written by software from other outlets’ reporting and may contain errors. A summary whose summary_source is \"publisher\" is the outlet’s own feed text. Always check the linked original."
}