{
  "id": 21191723,
  "title": "Kisseman–Christian Village bridge to close for six months for reconstruction",
  "url": "https://urgent.news/2026/11/22/kisseman-christian-village-bridge-to-close-for-six-months-for-21191723",
  "topic": "world",
  "section": "World",
  "published": "2026-11-22T09:23:36.000Z",
  "source": {
    "name": "Adom Online",
    "slug": "adom-online",
    "url": "https://www.adomonline.com/kisseman-christian-village-bridge-to-close-for-six-months-for-reconstruction/"
  },
  "original_language": "en",
  "account": null,
  "summary": "The bridge linking Kisseman and Christian Village in Accra will be closed to traffic for six months from the second week of December to allow for its reconstruction and elevation under the Greater Accra Resilient and Integrated Development (GARID) Project. The works are intended to improve the flow of rainwater through the area and reduce […]",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 2,
    "also_reported_by": [
      {
        "outlet": "MyJoyOnline Ghana",
        "title": "Kisseman–Christian Village bridge to close for six months for reconstruction",
        "url": "https://urgent.news/2026/11/22/kisseman-christian-village-bridge-to-close-for-six-months-for",
        "published": "2026-11-22T03:58:53.000Z"
      }
    ]
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}