{
  "id": 21160667,
  "title": "Visayas grid under yellow alert on Sunday, Nov. 22, 2026 - NGCP",
  "url": "https://urgent.news/2026/11/22/visayas-grid-under-yellow-alert-on-sunday-nov-22-2026-ngcp",
  "topic": "world",
  "section": "World",
  "published": "2026-11-22T03:20:09.000Z",
  "source": {
    "name": "GMA News",
    "slug": "gma-news",
    "url": "https://www.gmanetwork.com/news/topstories/regions/1010382/visayas-grid-under-yellow-alert-on-sunday-nov-22-2026-ngcp/story/"
  },
  "original_language": "en",
  "account": "The National Grid Corporation of the Philippines (NGCP) announced a yellow alert status for the Visayas grid on Sunday, November 22, 2026, due to low energy reserves. The alert is scheduled to be in effect from 5 p.m. to 9 p.m., as the grid is currently operating at 2,380 megawatts (MW) while the peak demand is 2,347 MW. This decision comes after several coal plants in the region went offline unexpectedly.\n\nTherma Visayas Inc. 2 and Palinpinon I Geothermal Power Plant Unit 1 will experience unplanned outages, while Palm Concepcion Power Corporation and KEPCO SPC Power Corporation Unit 2 will have planned outages. A limitation on the Mindanao-Visayas interconnection exists due to maintenance work on the Baloi-Kauswagan 230kV Line 1.\n\nIn total, 21 plants are operating at reduced capacities, contributing to 668.4 MW of unavailable power on the grid. The Department of Energy (DOE) has ordered the NGCP to install over 250 megawatts of battery energy storage system to address the thinning energy reserves. Meanwhile, the Energy Regulatory Commission (ERC) has issued 24 show-cause orders (SCO) against 13 power generation companies for power outages affecting Visayas and Mindanao.",
  "summary": "A declaration of yellow alert status over the Visayas grid is expected on Sunday, November 22 due to tight energy reserves, the National Grid Corporation of the Philippines (NGCP) said.",
  "key_points": [
    "Visayas grid under yellow alert on Nov. 22, 2026",
    "Low energy reserves cause alert, 2,380 MW operating",
    "21 plants at reduced capacity, 250 MW battery storage needed"
  ],
  "editors_take": "The convergence of unplanned outages and maintenance work places the Visayas grid in a precarious position, forcing regulators to demand immediate storage solutions and hold generators accountable for instability.",
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}