{
  "id": 21035845,
  "title": "India’s first bullet train project: 50-km Surat-Bilimora section gets overhead power supply",
  "url": "https://urgent.news/2026/11/21/indias-first-bullet-train-project-50-km-surat-bilimora-section-gets",
  "topic": "world",
  "section": "World",
  "published": "2026-11-21T11:02:25.000Z",
  "source": {
    "name": "The Indian Express - India",
    "slug": "the-indian-express-india",
    "url": "https://indianexpress.com/article/india/mumbai-ahmedabad-bullet-train-surat-bilimora-section-overhead-power-supply-10972710/"
  },
  "original_language": "en",
  "account": null,
  "summary": "The National High Speed Rail Corporation Limited (NHSRCL) has recently energised the overhead electrical system on the 50-km-long Surat-Bilimora section of the Mumbai-Ahmedabad bullet train corridor in Gujarat. This marks a significant milestone for the project, enabling further testing on the country's first high-speed rail (HSR) corridor. The section includes both Up and Down lines on the elevated alignment and is equipped with an advanced 2 × 25 kV Overhead Traction System. The 508-km corridor will have 14 Traction Substations to supply electricity to the overhead power system used by bullet trains.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}