{
  "id": 20858433,
  "title": "More than half of Prasa's new trains can't run due to signalling problems",
  "url": "https://urgent.news/2026/11/20/more-than-half-of-prasas-new-trains-cant-run-due-to-signalling",
  "topic": "world",
  "section": "World",
  "published": "2026-11-20T05:30:00.000Z",
  "source": {
    "name": "IOL",
    "slug": "iol",
    "url": "https://iol.co.za/the-star/news/2026-11-20-more-than-half-of-prasas-new-trains-cant-run-due-to-signalling-problems/"
  },
  "original_language": "en",
  "account": "Only about half of the new trains operated by the Passenger Rail Agency of SA (Prasa) are currently running due to signalling issues, a spokesperson for the agency told Parliament's Standing Committee on Public Accounts. Prasa presently owns around 350 of the new trains, but only needs approximately 170 to operate effectively. According to Prasa Group CEO Hishaam Emeran, the agency's inability to align its recovery of railway corridors with the production of new trains is the root cause of the problem. The agency's rebuilding and recovery program began in 2021 to address vandalism, reopen service lines, and boost commuter rail ridership following a decline in usage. A significant portion of the trains, known as the \"new blue trains,\" were procured in a R51 billion agreement with Gibela, an Ekurhuleni company, in 2013. However, delays in production have led to a mismatch between the number of trains manufactured and their actual usage. The National Treasury is currently reviewing a contract related to signalling infrastructure in Gauteng, which includes the installation of a new train control system. The Auditor-General raised concerns about potential procurement irregularities in the contract awarded last December. Prasa has already surpassed 100 million passenger trips in the 2025/26 financial year, a significant increase from 76 million in the previous year. However, the agency still needs around 350 million annual passenger trips to break even financially.",
  "summary": "Prasa CEO Hishaam Emeran told Scopa that the agency needs about 170 of its 350 new train sets under current operating conditions, with signalling and infrastructure limiting services.",
  "key_points": [
    "Only about half of Prasa's new trains can run due to signalling problems.",
    "Prasa owns around 350 new trains but needs only 170 for effective operation.",
    "National Treasury reviewing contract for signalling infrastructure in Gauteng."
  ],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}