{
  "id": 20825209,
  "title": "Mumbai Water Metro Project Gains Momentum; Consultant Selected For ₹1,621-Crore Phase 1, Electric Ferry Trials Underway",
  "url": "https://urgent.news/2026/11/19/mumbai-water-metro-project-gains-momentum-consultant-selected-for-1",
  "topic": "world",
  "section": "World",
  "published": "2026-11-19T22:53:14.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/mumbai/mumbai-water-metro-project-gains-momentum-consultant-selected-for-1621-crore-phase-1-electric-ferry-trials-underway"
  },
  "original_language": "en",
  "account": "Mumbai's Water Metro project has gained momentum as the Maharashtra Maritime Board (MMB) has selected a joint venture of TYPSA India Pvt. Ltd. and RINA Consulting SpA as the Project Management Consultant (PMC) for Phase 1, according to Minister Nitesh Rane. The approval for the ₹1,621-crore consultancy fee is pending state government clearance. Phase 1, slated for completion by 2029, encompasses 16 routes with 26 terminals, excluding three terminals managed by other agencies. The network aims to connect major residential, commercial and transport hubs through water-based services, with ridership expected to surpass 2 lakh daily by 2031. A pilot electric hydrofoil ferry, manufactured by Swedish company Candela, is currently undergoing trials in local waters before passenger services commence.",
  "summary": "Mumbai, November 19, 2026: Mumbai’s Water Metro project has moved closer to implementation, with the Maharashtra Maritime Board (MMB) selecting a joint venture of TYPSA India Pvt. Ltd. and RINA Consulting SpA as Project Management Consultant (PMC) for Phase 1, Minister Nitesh Rane said. At its 89th board meeting, MMB approved submitting a proposal to the state government seeking administrative…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}