{
  "id": 20714269,
  "title": "Ferretti relaunches on the Ancona hub",
  "url": "https://urgent.news/2026/11/19/ferretti-rilancia-sul-polo-di-ancona",
  "topic": "business",
  "section": "Business",
  "published": "2026-11-19T06:00:00.000Z",
  "source": {
    "name": "Il Sole 24 Ore",
    "slug": "il-sole-24-ore",
    "url": "https://www.ilsole24ore.com/art/ferretti-rilancia-polo-ancona-AJTji9KC"
  },
  "original_language": "it",
  "account": "Ancona will serve as a growth and retention hub for Ferretti Group for the next three decades. The Italian superyacht manufacturer confirms its presence in the Doric port and is ready to double its production capacity in the steel and aluminum semi-custom yacht segment by establishing a new production site, just a few dozen meters from the existing one. Stassi Anastassov, the Group's global CEO, emphasizes the confidence in the sector's future, Italian excellence, and the people working in Ancona. The total investment amounts to 30 million euros, with 16,000 square meters in the former Tubimar area (86,000 square meters total), which will see demolition and cleanup operations by the Port Authority System starting on Monday. The demolition and cleanup are set to take 180 days to transform the entire area into a naval shipbuilding hub. Bruno Piantini, who leads the Ancona production hub, explains that there is no more space to build boats, and they are already using all available space. The investment is driven by a thirty-year lease with the Port Authority, the speed of obtaining authorizations thanks to the Zes, and the expertise accumulated over a century of history by welcoming the CNR, the historic Doric yard founded in 1963, and Mario Morini, founded in 1945, in Ancona in 1999 and three years later, respectively. Thanks to the Zes, Ferretti Group received authorization to expand one of the production halls where superyachts up to 100 meters are built. The Group currently produces the highest value in production compared to the other six yards, totaling 400 million euros, with an objective to reach 500 million thanks to the new investment. The development of the new hub at the former Tubimar will follow a modular logic, with one site at a time, aiming for five in total, built to the highest sustainability standards with solar panels on the roofs. The timeline for this is 2028, a date to remember for those in the boat building industry. Ferretti already has a new yacht in the portfolio, which will be built in that area, and has already requested a modification to the initial project: it requires 10 more meters of height. Inside, 350 workers will work, and the same number will be engaged in the subcontracting process. \"At Ferretti, we don't want to limit ourselves to talking about long-term growth,\" Anastassov says. \"We want to invest in growth, build it, and turn it into concrete results.\" This is happening in Ancona, where the Port Authority's Triennial Plan, chaired by Mirco Carloni, has chosen to open spaces for private investments, \"with clear rules and times in line with the private business cycle.\"",
  "summary": "In Ancona to grow and stay, at least for the next thirty years. Ferretti Group confirms its presence in the Marche port and is ready to double its production capacity there.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}