{
  "id": 20619263,
  "title": "Nairobi Expressway Operator Posts Sh5.1 Billion Loss Despite Sh9.6B Toll Revenue",
  "url": "https://urgent.news/2026/11/18/nairobi-expressway-operator-posts-sh5-1-billion-loss-despite-sh9-6b",
  "topic": "finance",
  "section": "Finance & Markets",
  "published": "2026-11-18T16:20:48.000Z",
  "source": {
    "name": "KahawaTungu",
    "slug": "kahawatungu",
    "url": "https://kahawatungu.com/nairobi-expressway-operator-posts-sh5-1-billion-loss-despite-sh9-6b-toll-revenue/"
  },
  "original_language": "en",
  "account": "Along the elevated Nairobi Expressway, it's hard to miss the toll gates that have significantly reduced commuting times for thousands of drivers traveling between Mlolongo and James Gichuru Road. However, behind the gleaming infrastructure and efficient toll gates, the financial reality of the project is facing serious challenges. The private operator, Moja Expressway Company Limited, has reported a substantial net loss of Sh5.1 billion for the financial year ending December 2025. This figure comes from the National Treasury's Fifth Annual Report on Public-Private Partnerships in Kenya, highlighting the project's financial struggles despite its popularity among the public. While toll gate collections have soared to Sh9.63 billion for the year, the costs involved have surged to Sh14.73 billion, leading to the significant loss. This loss, up from Sh1.2 billion the previous year, highlights the strain on the operator despite the high usage of the road. The key issue stems from the project's financing and the Kenyan economy's dynamics. Built by the China Road and Bridge Corporation, the expressway is largely funded through debt denominated in foreign currencies, specifically US Dollars. This creates a mismatch when the company collects tolls in Kenyan Shillings, leading to potential currency conversion losses of up to 38 percent due to shilling depreciation. Additionally, rising global interest rates on the company's commercial loans add to the financial pressure. Despite the losses, traffic on the expressway has been growing steadily, with vehicle volumes increasing from 7.21 million in Q1 2025 to 7.36 million in Q4 2025, with a peak of 2.56 million vehicles in March 2026. The road is also noted for its efficient incident response time of 20 minutes, which is below the targeted 30 minutes. While the financial setbacks have sparked political and public scrutiny, Treasury Cabinet Secretary John Mbadi has assured that the loss is the operator's responsibility, not the taxpayers', under the Public-Private Partnership model. He has called for a thorough review of the project's economics to determine if the financial challenges are due to temporary economic fluctuations or inherent flaws in its original design and structuring. As Kenya plans to replicate this successful model on other major highways, lessons from the Nairobi Expressway's financial performance will be crucial. The model, while a traffic success, presents a financial cautionary tale for future infrastructure projects, stressing the need for comprehensive risk assessments including currency volatility and global interest rate fluctuations.",
  "summary": "Walk along Uhuru Highway these days, and the elevated Nairobi Expressway is impossible to miss. It has undeniably cut down commute times for thousands of motorists moving between Mlolongo and James Gichuru Road. But behind the smooth tarmac and the sleek toll gates, the financial engineering of the project is facing severe headwinds. Fresh disclosures [...] The post Nairobi Expressway Operator…",
  "key_points": [
    "Moja Expressway Company Limited posted Sh5.1 billion loss in 2025",
    "Toll revenue reached Sh9.63 billion despite high usage",
    "Currency conversion losses and interest rate hikes caused financial pressure"
  ],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}