{
  "id": 20415450,
  "title": "Nkwanta-Dambai Road Project: MCE directs contractor to fix Kechiebi defects, expedite work",
  "url": "https://urgent.news/2026/11/17/nkwanta-dambai-road-project-mce-directs-contractor-to-fix-kechiebi",
  "topic": "world",
  "section": "World",
  "published": "2026-11-17T10:01:59.000Z",
  "source": {
    "name": "Adom Online",
    "slug": "adom-online",
    "url": "https://www.adomonline.com/nkwanta-dambai-road-project-mce-directs-contractor-to-fix-kechiebi-defects-expedite-work/"
  },
  "original_language": "en",
  "account": "The Municipal Chief Executive (MCE) for Nkwanta South in the Oti Region, Joseph Awal Antwi, has directed Eagle Star Construction to fix issues found on the Nkwanta-Dambai road and speed up the project. This came after an inspection of the 49-kilometre road, which is set to be finished by the end of 2027. Mr Antwi praised the work so far but pointed out some areas that need improvement. He ordered the contractor to replace a U-drain between Kechiebi and Alokpatsa with a culvert, and to build a bus stop at the Kechiebi market to make things easier for people who travel back and forth. The MCE said when the road is done, it will make traveling and moving things around much easier, and it will help the local economies. Speaking to Adom News, Mr Antwi also told the contractor to water the road regularly, especially in busy areas, to keep the dust down. He warned that too much dust can cause health problems for residents. The MCE said keeping residents happy and healthy is very important for the Municipal Assembly and the government. The 49-kilometre Nkwanta-Dambai road will make it easier to travel around the Oti Region and will help people do business when it is all finished.",
  "summary": "The Municipal Chief Executive (MCE) for Nkwanta South in the Oti Region, Joseph Awal Antwi, has urged Eagle Star Construction to address defects identified on the Nkwanta-Dambai road and accelerate work on the project. The directive follows an inspection of the 49-kilometre road project, which is expected to be completed by the end of 2027. […]",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}