{
  "id": 20236865,
  "title": "PDP calls for full utilisation of Sindh’s wind corridor",
  "url": "https://urgent.news/2026/11/15/pdp-calls-for-full-utilisation-of-sindhs-wind-corridor",
  "topic": "business",
  "section": "Business",
  "published": "2026-11-15T23:18:15.000Z",
  "source": {
    "name": "Business Recorder",
    "slug": "business-recorder",
    "url": "https://www.brecorder.com/news/40449049/pdp-calls-for-full-utilisation-of-sindhs-wind-corridor"
  },
  "original_language": "en",
  "account": "Karachi witnessed a call from Pasban Democratic Party Chairman AltafShakoor for full utilization of Sindh's wind corridor, as Pakistan grapples with energy insecurity and high import bills. The Gharo–Jhimpir–Keti Bandar wind corridor has the potential to generate over 50,000 MW of clean, low-cost electricity, which could meet the nation's electricity needs and end the need for importing billions of dollars of fuel. Currently, Pakistan's total installed wind capacity is only around 1,838 MW, far less than the corridor's estimated 11 GW of economically viable capacity. However, transmission bottlenecks cause up to 1,750 MW of southern wind power to be curtailed, resulting in 491.89 GWh of renewable energy going unused each year. Despite this, Pakistan is importing expensive fossil fuels and suffering from loadshedding. AltafShakoor emphasized that the wind corridor's potential is a proven, bankable resource, and full utilization would save billions of dollars in foreign exchange, shield consumers from fuel price shocks, and reduce the circular debt pressure. He highlighted the World Bank-backed USD 375.9 million grid upgrade, which will enable the transmission of 1,840 MW from southern Pakistan, and stressed the need for urgent upgrades to the transmission network, particularly the 660 kV Matiari–Lahore direct current line, to unlock the corridor's potential. AltafShakoor called for immediate action from the Ministry of Energy, NEPRA, and the National Grid Company to enforce priority dispatch for wind, accelerate transmission upgrades, and create a stable, predictable policy environment that attracts investment.",
  "summary": "KARACHI: As Pakistan continues to grapple with energy insecurity, high import bills, and persistent loadshedding, Pasban Democratic Party (PDP) Chairman AltafShakoor here on Sunday called for urgent and full utilisation of Sindh’s Gharo–Jhimpir–Keti Bandar wind corridor, a natural asset with the proven potential to generate over 50,000 megawatts (MW) of clean, low-cost electricity, which alone…",
  "key_points": [
    "PDP Chairman AltafShakoor urges full use of Sindh's wind corridor.",
    "Corridor can generate over 50,000 MW clean electricity to end energy insecurity.",
    "Transmission bottlenecks curtail 1,750 MW, causing 491.89 GWh of renewable energy loss annually."
  ],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}