{
  "id": 1896089,
  "title": "Torrevieja’s New Bus Station Delayed Until at Least 2028",
  "url": "https://urgent.news/2026/08/19/torreviejas-new-bus-station-delayed-until-at-least-2028",
  "topic": "world",
  "section": "World",
  "published": "2026-08-19T08:40:22.000Z",
  "source": {
    "name": "The Leader",
    "slug": "the-leader",
    "url": "https://theleader.info/2026/08/19/torreviejas-new-bus-station-delayed-until-at-least-2028/"
  },
  "original_language": "en",
  "account": null,
  "summary": "The City Council of Torrevieja is delaying the construction of a new municipal bus station until at least 2028, leaving the city reliant on the outdated private terminal on Avenida de las Habaneras. The new transport hub is planned for Enclave 13, a 40,000 square metre plot between CV-905, Avenida Rosa Mazón, and Calle Juan Valera. However, the project is still in early stages, with necessary planning procedures and a traffic study yet to be completed. Despite the delay, the existing terminal remains a crucial transport hub, connecting Torrevieja with various destinations across Spain.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}