{
  "id": 18454776,
  "title": "Selangor to review approved projects, tighten flood mitigation requirements in high-risk areas",
  "url": "https://urgent.news/2026/11/06/selangor-to-review-approved-projects-tighten-flood-mitigation",
  "topic": "world",
  "section": "World",
  "published": "2026-11-06T06:24:14.000Z",
  "source": {
    "name": "Malay Mail",
    "slug": "malay-mail",
    "url": "https://www.malaymail.com/news/malaysia/2026/11/06/selangor-to-review-approved-projects-tighten-flood-mitigation-requirements-in-high-risk-areas/242198"
  },
  "original_language": "en",
  "account": "Selangor's state government plans to conduct a review of all approved development projects to ensure flood mitigation systems are implemented in high-risk areas, according to Selangor Menteri Besar Datuk Seri Amirudin Shari. The measure aims to reduce flood risks and prevent future incidents in affected regions. Amirudin emphasized the need for developers to construct temporary water retention facilities, warning against substandard work. He inspected a retention pond site at the UiTM Puncak Alam campus and identified other issues contributing to flooding in areas like Johan Setia, Parit Mahang, Bukit Kuching, and Bukit Hijau. These issues include vandalism along the Sungai Buloh 1 Flood Mitigation Scheme embankments and water overflow from the West Coast Expressway. The government has requested immediate action against illegal operations and scheduled demolitions to designate the sites as water catchment areas or floodplains. Similarly, Amirudin addressed a local mosque's frequent flooding, suggesting either raising the structure or relocating it to a safer site due to low-lying terrain and overflow from the Subang River.",
  "summary": "KUALA SELANGOR, Nov 6 — The Selangor state government will order a review of previously approved devel...",
  "key_points": [
    "Selangor government to review approved projects for flood mitigation",
    "High-risk areas targeted to reduce flood risks and prevent incidents",
    "Temporary water retention facilities and illegal operations addressed"
  ],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 4,
    "also_reported_by": [
      {
        "outlet": "The Vibes",
        "title": "Selangor rolls out 105 flood mitigation projects worth RM4.28b amid renewed flooding",
        "url": "https://urgent.news/2026/11/06/selangor-rolls-out-105-flood-mitigation-projects-worth-rm4-28b-amid",
        "published": "2026-11-06T04:17:00.000Z"
      },
      {
        "outlet": "Bernama",
        "title": "General : Selangor To Ensure Flood Mitigation Measures Are Implemented In Development Projects",
        "url": "https://urgent.news/2026/11/06/general-selangor-to-ensure-flood-mitigation-measures-are-implemented",
        "published": "2026-11-06T04:47:51.000Z"
      },
      {
        "outlet": "Free Malaysia Today",
        "title": "Selangor to review development approvals to ensure flood mitigation measures",
        "url": "https://urgent.news/2026/11/06/selangor-to-review-development-approvals-to-ensure-flood-mitigation",
        "published": "2026-11-06T06:47:29.000Z"
      }
    ]
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}