{
  "id": 18307060,
  "title": "Ghandhara Industries to Assemble Zhongtong Buses in Pakistan",
  "url": "https://urgent.news/2026/11/05/ghandhara-industries-to-assemble-zhongtong-buses-in-pakistan",
  "topic": "tech",
  "section": "Tech",
  "published": "2026-11-05T12:48:24.000Z",
  "source": {
    "name": "ProPakistani",
    "slug": "propakistani",
    "url": "https://propakistani.pk/2026/11/05/ghandhara-industries-to-assemble-zhongtong-buses-in-pakistan/"
  },
  "original_language": "en",
  "account": "Ghandhara Industries Limited has set aside a budget of Rs. 2 billion to Rs. 3 billion for constructing an assembly line for Zhongtong buses in Pakistan. This includes the installation of a solar power system at the facility. In their corporate briefing, the company mentioned that the solar-powered setup will help lower operating costs in the future. Ghandhara aims to sell 300 to 400 Zhongtong buses annually. These buses come in two sizes: 10-metre and 12.5-metre, with the latter priced around Rs. 44 million. The larger model is roughly Rs. 4 million to Rs. 5 million less than comparable Yutong buses. Management anticipates the solar installation to result in significant cost savings as the facility becomes fully solar-powered. The news piece about Ghandhara Industries assembling Zhongtong buses in Pakistan was initially published on ProPakistani.",
  "summary": "Ghandhara Industries Limited has allocated approximately Rs. 2 billion to Rs. 3 billion for its Zhongtong bus assembly line in … Read More The post Ghandhara Industries to Assemble Zhongtong Buses in Pakistan appeared first on ProPakistani .",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}