{
  "id": 18136148,
  "title": "Ondo community seeks Aiyedatiwa’s intervention over road, electricity",
  "url": "https://urgent.news/2026/11/04/ondo-community-seeks-aiyedatiwas-intervention-over-road-electricity",
  "topic": "world",
  "section": "World",
  "published": "2026-11-04T15:12:51.000Z",
  "source": {
    "name": "Punch Nigeria",
    "slug": "punch-nigeria",
    "url": "https://punchng.com/ondo-community-seeks-aiyedatiwas-intervention-over-road-electricity/"
  },
  "original_language": "en",
  "account": "In Ondo State, the Akotogbo and Ijuosun communities have urgently requested Governor Lucky Aiyedatiwa to complete the 28-kilometre road connecting the two areas and to provide electricity. The Akotogbo and Ijuosun Youths Forum, in a letter dated November 4, 2026, expressed the community's frustration with the ongoing road project, which was approved in June 2024 but remains unfinished. Residents face challenging travel conditions due to deep potholes, erosion, and overgrown sections, making access to farms, markets, schools, and healthcare facilities difficult. The group also highlighted the need for emergency repairs, drainage channel clearing, and the installation of warning signs to ensure safe travel. Additionally, the youths called for an independent technical assessment of the completed sections to verify compliance with construction specifications. Regarding electricity, both communities have struggled with inadequate power infrastructure for over two decades, with Ijuosun never even being connected to the national grid. The absence of reliable electricity hinders productivity for artisans, small businesses, and students, as they are forced to rely on fuel for lighting, causing financial strain on households. The Akotogbo and Ijuosun Youths Forum urged the governor to meet with community representatives and provide a written response within 14 days, detailing the proposed interventions and responsible officials.",
  "summary": "Residents of Akotogbo and Ijuosun communities in Ondo State have appealed to Governor Lucky Aiyedatiwa to complete a 28km road and provide electricity. Read More: https://punchng.com/ondo-community-seeks-aiyedatiwas-intervention-over-road-electricity/",
  "key_points": [
    "28-kilometre road project approved in June 2024 but unfinished.",
    "Residents face travel challenges due to potholes, erosion, and overgrown sections."
  ],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}