{
  "id": 16571028,
  "title": "General : Lynas Radioactive Waste Disposal Facility 77 Pct Complete As Of Aug 31",
  "url": "https://urgent.news/2026/10/26/general-lynas-radioactive-waste-disposal-facility-77-pct-complete-as",
  "topic": "world",
  "section": "World",
  "published": "2026-10-26T05:31:52.000Z",
  "source": {
    "name": "Bernama",
    "slug": "bernama",
    "url": "http://www.bernama.com/en/news.php?id=2625715"
  },
  "original_language": "en",
  "account": null,
  "summary": "KUALA LUMPUR, Oct 26 (Bernama) -- The permanent disposal facility (PDF) for radioactive waste generated by Lynas Malaysia Sdn Bhd had achieved 77 per cent completion in construction and operations as of Aug 31, with 1.45 million metric tonnes of the 1.467 million metric tonnes of Water Leach Purification (WLP) waste generated having been transferred to the facility.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 2,
    "also_reported_by": [
      {
        "outlet": "Malay Mail",
        "title": "Lynas waste disposal facility reaches 77pc completion as 2031 deadline looms",
        "url": "https://urgent.news/2026/10/26/lynas-waste-disposal-facility-reaches-77pc-completion-as-2031",
        "published": "2026-10-26T06:28:50.000Z"
      }
    ]
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}