{
  "id": 16098748,
  "title": "Tenders floated for elevated corridor from Lighthouse to Thiru. Vi. Ka. Bridge",
  "url": "https://urgent.news/2026/10/22/tenders-floated-for-elevated-corridor-from-lighthouse-to-thiru-vi-ka",
  "topic": "world",
  "section": "World",
  "published": "2026-10-22T19:21:12.000Z",
  "source": {
    "name": "The Hindu",
    "slug": "the-hindu",
    "url": "https://www.thehindu.com/news/cities/chennai/tenders-floated-for-elevated-corridor-from-lighthouse-to-thiru-vi-ka-bridge/article71612422.ece"
  },
  "original_language": "en",
  "account": null,
  "summary": "Highways Department calls for consultants to prepare a detailed project report. The corridor will run via Santhome High Road, Greenways Road, and Durgabai Deshmukh Road. It will have two lanes up to 1.8 km, and four lanes for the remaining stretch. The project will take 2 years to complete",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}