{
  "id": 1579592,
  "title": "Re-occupancy of Bridgeland Place affordable housing high-rise pushed to late 2028",
  "url": "https://urgent.news/2026/08/17/re-occupancy-of-bridgeland-place-affordable-housing-high-rise-pushed",
  "topic": "world",
  "section": "World",
  "published": "2026-08-17T22:44:31.000Z",
  "source": {
    "name": "Calgary Herald",
    "slug": "calgary-herald",
    "url": "https://calgaryherald.com/news/exterior-work-underway-at-bridgeland-place"
  },
  "original_language": "en",
  "account": null,
  "summary": "After its final tenants were moved out and relocated, the tower's interior was stripped down to the concrete in 2024, in preparation of installing new electrical, water, heating and ventilation systems and plumbing.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}