{
  "id": 1533244,
  "title": "TCN boosts Lagos power capacity with two transmission projects",
  "url": "https://urgent.news/2026/08/17/tcn-boosts-lagos-power-capacity-with-two-transmission-projects",
  "topic": "finance",
  "section": "Finance & Markets",
  "published": "2026-08-17T17:46:05.000Z",
  "source": {
    "name": "Nairametrics",
    "slug": "nairametrics",
    "url": "https://nairametrics.com/2026/08/17/tcn-boosts-lagos-power-capacity-with-two-transmission-projects/"
  },
  "original_language": "en",
  "account": null,
  "summary": "The Transmission Company of Nigeria (TCN) has increased bulk power capacity around the Apapa corridor with the commissioning of two 60 MVA 132/33kV GIS substations at the upgraded Apapa Road Transmission Substation and two new 100 MVA power transformers at the 132/33kV Ijora Transmission Substation in Lagos. The post TCN boosts Lagos power capacity with two transmission projects appeared first on…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}