{
  "id": 14405712,
  "title": "Five govt buildings get solar installations ahead of schedule, says works minister",
  "url": "https://urgent.news/2026/10/14/five-govt-buildings-get-solar-installations-ahead-of-schedule-says",
  "topic": "world",
  "section": "World",
  "published": "2026-10-14T08:43:27.000Z",
  "source": {
    "name": "Malay Mail",
    "slug": "malay-mail-malaymail",
    "url": "https://www.malaymail.com/news/malaysia/2026/10/14/five-govt-buildings-get-solar-installations-ahead-of-schedule-says-works-minister/239105"
  },
  "original_language": "en",
  "account": null,
  "summary": "Five government buildings in Malaysia have completed solar installations ahead of schedule, according to Works Minister Datuk Seri Alexander Nanta Linggi. The combined installed capacity of these grid-connected photovoltaic (GCPV) projects is 779.86 kilowatts, with two projects at the Ministry of Foreign Affairs and the other three at the National Water Research Institute of Malaysia (Nahrim), Hospital Canselor Tuanku Muhriz (HCTM), and the Department of Irrigation and Drainage (DID). Linggi highlighted that this initiative is a significant step towards expanding clean energy use, reducing operating costs, and promoting sustainable public asset management. The Public Works Department (JKR) has also implemented similar projects in 46 Federal Government buildings, 283 rural schools, four Royal Malaysia Police border posts, and an Orang Asli village, with the potential to generate energy cost savings of up to RM115 million annually.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 3,
    "also_reported_by": [
      {
        "outlet": "Bernama",
        "title": "General : Five Government Building Solar Projects Completed Ahead Of Schedule - Nanta",
        "url": "https://urgent.news/2026/10/14/general-five-government-building-solar-projects-completed-ahead-of",
        "published": "2026-10-14T06:37:55.000Z"
      },
      {
        "outlet": "Malay Mail",
        "title": "Five govt buildings get solar installations ahead of schedule, says works minister",
        "url": "https://urgent.news/2026/10/14/five-govt-buildings-get-solar-installations-ahead-of-schedule-says-14410753",
        "published": "2026-10-14T08:43:27.000Z"
      }
    ]
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}