{
  "id": 1432583,
  "title": "Room to grow: 524 classroom projects worth RM668m in the works for 2027",
  "url": "https://urgent.news/2026/08/17/room-to-grow-524-classroom-projects-worth-rm668m-in-the-works-for-2027",
  "topic": "world",
  "section": "World",
  "published": "2026-08-17T06:21:43.000Z",
  "source": {
    "name": "Malay Mail",
    "slug": "malay-mail-malaymail",
    "url": "https://www.malaymail.com/news/malaysia/2026/08/17/newsmalaysia20260817rm668-million-later-2027s-year-one-pupils-will-have-1780-new-classrooms-waiting231668/231668"
  },
  "original_language": "en",
  "account": "KUALA NERUS, August 17 — In anticipation of the Year One intake for the 2027 session, a total of 524 additional classroom projects, valued at RM668 million, are currently underway across the country, according to Deputy Works Minister Datuk Seri Dr Ahmad Maslan. Of these approved projects, 517 have received Letters of Acceptance (LoAs), with three projects already completed ahead of schedule. The utilization of modular methods and the Industrialised Building System (IBS) is a key feature of these initiatives. Dr. Maslan made this announcement after the handover ceremony of the first project completed ahead of schedule, officially witnessed by Education Minister Fadhlina Sidek at Sekolah Menengah Kebangsaan Tok Jembal today. These projects encompass 459 schools and 1,780 classrooms, with 1,255 standard classrooms and 525 allocated for the Special Education Integration Programme (PPKI). Selangor leads the charge with 143 projects, all of which have secured LoAs, followed closely by Kedah with 93 projects (92 approved) and Johor with 47 projects (45 approved). Terengganu contributes 45 projects with LoAs, while Penang has 30 (all approved). Perak follows with 22 projects (18 approved), and Penang and Melaka each boast 69 projects with LoAs. The remaining states, including Pahang, Kelantan, Perlis, Labuan, Kuala Lumpur, and Negeri Sembilan, have also received LoAs for their respective projects.",
  "summary": "KUALA NERUS, Aug 17 — A total of 524 additional classroom projects worth RM668 million are underway nationwide for...",
  "key_points": [
    "524 classroom projects valued at RM668m underway for 2027 intake",
    "517 projects received Letters of Acceptance, 3 completed ahead of schedule",
    "Selangor leads with 143 approved projects, followed by Kedah and Johor"
  ],
  "editors_take": "The surge in classroom projects nationwide signals a significant push to expand and upgrade school infrastructure ahead of the 2027 academic session, particularly benefiting special education programmes.",
  "illustration": null,
  "coverage": {
    "outlets": 2,
    "also_reported_by": [
      {
        "outlet": "Malay Mail",
        "title": "Room to grow: 524 classroom projects worth RM668m in the works for 2027",
        "url": "https://urgent.news/2026/08/17/room-to-grow-524-classroom-projects-worth-rm668m-in-the-works-for-2027-1438436",
        "published": "2026-08-17T06:21:43.000Z"
      }
    ]
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}