{
  "id": 13160447,
  "title": "PJM approves fast-track interconnection for 2.1 GW from Engie, LS Power",
  "url": "https://urgent.news/2026/10/09/pjm-approves-fast-track-interconnection-for-2-1-gw-from-engie-ls-power",
  "topic": "business",
  "section": "Business",
  "published": "2026-10-09T14:27:49.000Z",
  "source": {
    "name": "Utility Dive",
    "slug": "utility-dive",
    "url": "https://www.utilitydive.com/news/engie-ls-power-pjm-expedited-interconnection-eit/832613/"
  },
  "original_language": "en",
  "account": null,
  "summary": "The grid operator expects Engie’s two storage projects totaling nearly 1.7 GW and LS Power’s 455-MW gas-fired uprate will be online by mid-2029.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}