{
  "id": 13158701,
  "title": "Mumbai: BMC Removes 180 Structures To Clear Goregaon-Mulund Link Road Project Alignment",
  "url": "https://urgent.news/2026/10/09/mumbai-bmc-removes-180-structures-to-clear-goregaon-mulund-link-road",
  "topic": "world",
  "section": "World",
  "published": "2026-10-09T16:12:11.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/mumbai/mumbai-bmc-removes-180-structures-to-clear-goregaon-mulund-link-road-project-alignment"
  },
  "original_language": "en",
  "account": null,
  "summary": "Mumbai, October 9, 2026: The Brihanmumbai Municipal Corporation (BMC) on Friday removed 180 structures obstructing the Goregaon-Mulund Link Road (GMLR) project at Khindipada-Sonapur in the S ward, clearing almost the entire stretch of the project alignment within the ward limits. The 12.20-km-long GMLR, a crucial east-west corridor, is being developed in four phases and includes road…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 2,
    "also_reported_by": [
      {
        "outlet": "Free Press Journal",
        "title": "Mumbai: BMC Demolishes 30 Structures At Borivali Connector For Coastal Road North Project",
        "url": "https://urgent.news/2026/10/09/mumbai-bmc-demolishes-30-structures-at-borivali-connector-for-coastal",
        "published": "2026-10-09T16:17:10.000Z"
      }
    ]
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}