{
  "id": 13005404,
  "title": "Complete Construction Of Satya Sai Square Flyover By Dec, Says Indore Divisional Commissioner",
  "url": "https://urgent.news/2026/10/09/complete-construction-of-satya-sai-square-flyover-by-dec-says-indore",
  "topic": "world",
  "section": "World",
  "published": "2026-10-09T02:00:00.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/indore/complete-construction-of-satya-sai-square-flyover-by-dec-says-indore-divisional-commissioner"
  },
  "original_language": "en",
  "account": null,
  "summary": "The Indore Divisional Commissioner, Bhaskar Lakshakar, has stated that the construction of the Satya Sai Square flyover bridge will be completed by December. During a recent inspection of the 6-kilometre elevated corridor being built from Navlakha Square to LIG Square, the commissioner and collector Shivam Verma reviewed the progress and confirmed that the project is moving in line with Chief Minister Mohan Yadav's vision. The completion of the LIG elevated corridor is expected to benefit over one lakh motorists and improve traffic flow by allowing direct travel from the Rajiv Gandhi statue to the LIG corridor. Construction of the elevated corridor has already begun at Shivaji Vatika Square, with work at Navlakha Square set to commence after Diwali. To minimize traffic disruptions, traffic diversions will be implemented as needed during the construction process.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}