{
  "id": 12332499,
  "title": "Mumbai's Ghatkopar ROB Design Changed Midway; 3 Pier Caps To Be Partially Demolished, Rebuilt After 30% Work Done",
  "url": "https://urgent.news/2026/10/06/mumbais-ghatkopar-rob-design-changed-midway-3-pier-caps-to-be",
  "topic": "world",
  "section": "World",
  "published": "2026-10-06T07:11:39.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/mumbai/mumbais-ghatkopar-rob-design-changed-midway-3-pier-caps-to-be-partially-demolished-rebuilt-after-30-work-done-mumbai-news"
  },
  "original_language": "en",
  "account": null,
  "summary": "Mumbai: The design of Mumbai’s under-construction Ghatkopar Road Overbridge (ROB) has been revised midway through construction, with three pier caps set to be partially demolished and rebuilt at a higher level. The change, being made after around 30 per cent of the work had already been completed, is aimed at separating local traffic from vehicles travelling between Andheri and the Eastern…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}