{
  "id": 12185355,
  "title": "MISO proposes fast-track large load, generation study process",
  "url": "https://urgent.news/2026/10/05/miso-proposes-fast-track-large-load-generation-study-process",
  "topic": "business",
  "section": "Business",
  "published": "2026-10-05T14:01:26.000Z",
  "source": {
    "name": "Utility Dive",
    "slug": "utility-dive",
    "url": "https://www.utilitydive.com/news/miso-large-load-generation-study-lars-ferc/832114/"
  },
  "original_language": "en",
  "account": null,
  "summary": "The 120-day study process would be available for loads larger than 200 MW and new generation that *are*>is* in the same local resource zone, which generally cover individual states.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}