{
  "id": 11691344,
  "title": "Navi Mumbai Traffic Updates: Thane-Belapur Road To Shut On 4 Nights For Airoli-Katai Naka Flyover Girder Work; Check Alternate Routes And Diversions",
  "url": "https://urgent.news/2026/10/03/navi-mumbai-traffic-updates-thane-belapur-road-to-shut-on-4-nights",
  "topic": "world",
  "section": "World",
  "published": "2026-10-03T13:06:25.000Z",
  "source": {
    "name": "Free Press Journal",
    "slug": "free-press-journal",
    "url": "https://www.freepressjournal.in/mumbai/navi-mumbai-traffic-updates-thane-belapur-road-to-shut-on-4-nights-for-airoli-katai-naka-flyover-girder-work-check-alternate-routes-and-diversions"
  },
  "original_language": "en",
  "account": "Navi Mumbai residents and motorists can expect disruptions on the Thane-Belapur Road from October 4 to 11, as traffic will be shut between 11 pm and 6 am for the installation of girders on the Airoli-Katai Naka flyover. The Mumbai Metropolitan Region Development Authority (MMRDA) is conducting the work near the Bharat Bijlee and Siemens companies in Airoli. To avoid inconvenience, authorities have announced designated alternative routes for vehicles traveling from Thane to Belapur and vice versa. Six-wheelers and larger vehicles will be diverted from Mukund Company in Digha via MIDC roads, while four-wheelers will need to take specific turns at Bharat Bijlee Chowk, Airoli Fire Brigade Chowk, and Khedekar Chowk. For those traveling from Belapur to Thane via Patni, the diversion will be through the Rabale Naka signal, turning right and using internal MIDC roads via Mukund Company. Parking is prohibited on the restricted stretch during the specified hours, with MMRDA vehicles exempted from the restrictions. Residents are advised to plan their late-night travel accordingly and cooperate with traffic personnel.",
  "summary": "Navi Mumbai, October 3, 2026: Residents and motorists using the Thane-Belapur Road are likely to face inconvenience on four nights this month as traffic will be shut between 11 pm and 6 am for girder installation work on the Airoli-Katai Naka flyover. The road will remain closed during the night of October 4 and from October 9 to 11, with the Navi Mumbai Traffic Department announcing diversions…",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}