{
  "id": 11378792,
  "title": "Editorial: Extending New Roads Defect Liability Period Is A Call In The Right Direction",
  "url": "https://urgent.news/2026/10/02/editorial-extending-new-roads-defect-liability-period-is-a-call-in",
  "topic": "world",
  "section": "World",
  "published": "2026-10-02T06:51:01.000Z",
  "source": {
    "name": "The Chronicle Ghana",
    "slug": "the-chronicle-ghana",
    "url": "https://thechronicle.com.gh/editorial-extending-new-roads-defect-liability-period-is-a-call-in-the-right-direction/"
  },
  "original_language": "en",
  "account": null,
  "summary": "The Minister of Roads and Highways in Ghana, Governs Kwame Agbodza, has called for an extension of the defect liability period for road contracts, arguing that the current one-year period is insufficient to hold contractors accountable for poor-quality roads. During an inspection of the Accra-Kumasi N6 highway, Agbodza emphasized that contractors and consultants should be held responsible for defects that arise after the completion of projects, which often cost the government billions of cedis. He expressed confidence in Ghanaian engineers and contractors, stating that a longer liability period would encourage durable road construction and protect public investment. However, the proposal also calls for strengthening supervision, testing, and enforcement of specifications to ensure that the extension of liability truly improves road quality.",
  "key_points": [],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}