{
  "id": 1031188,
  "title": "MCMC boosts UTeM's digital connectivity, benefiting more than 12,000 students",
  "url": "https://urgent.news/2026/08/15/mcmc-boosts-utems-digital-connectivity-benefiting-more-than-12-000",
  "topic": "science",
  "section": "Science",
  "published": "2026-08-15T12:23:45.000Z",
  "source": {
    "name": "New Straits Times",
    "slug": "new-straits-times",
    "url": "https://www.nst.com.my/news/nation/2026/08/1511822/mcmc-boosts-utems-digital-connectivity-benefiting-more-12000-students"
  },
  "original_language": "en",
  "account": "More than 12,000 students at Universiti Teknikal Malaysia Melaka (UTeM) are reaping the benefits of upgraded digital infrastructure, according to a statement from the Malaysian Communications and Multimedia Commission (MCMC). The USP project, implemented by MCMC, has seen 410 Wi-Fi access points installed across the campus, alongside the construction of a new 4G communications tower. As of June 2025, 108 of the planned 410 APs were already operational, with an additional 302 APs set to completion by September 23, followed by the tower's completion in November.\n\nMCMC's Southern Region senior director, Rizal Abd Malek, inspected the project at UTeM, alongside UTeM officials. The upgraded connectivity aims to support smart laboratories, cloud-based engineering software, digital simulations, and other learning applications integral to the modern TVET ecosystem. The initiative also aims to create a more conducive learning environment and equip students and educators with effective digital technology skills. The upgrade is part of the Communications Ministry's efforts to strengthen digital connectivity at public higher education institutions, aligning with contemporary educational needs and technological advancements.",
  "summary": "ALOR GAJAH: More than 12,000 students at Universiti Teknikal Malaysia Melaka (UTeM) are benefiting from upgraded digital infrastructure, including 410 Wi-Fi access points (APs) and a new 4G communications tower at the university.",
  "key_points": [
    "MCMC upgraded digital infrastructure for 12,000+ UTeM students",
    "410 Wi-Fi access points installed across campus as of June 2025",
    "4G tower completion planned for November 2025"
  ],
  "editors_take": null,
  "illustration": null,
  "coverage": {
    "outlets": 1,
    "also_reported_by": []
  },
  "ai_generated": true,
  "disclaimer": "Summaries, key points and the editor’s take are written by software from other outlets’ reporting and may contain errors — always check the linked original."
}